- Expand README with full setup instructions, file structure, and testing notes - Add lesson modules for 3.1–3.5 covering What is GSD through Verify & Beyond - Add course-structure.json, PROJECT_BRIEF.md, and .claude/ commands
4.3 KiB
3.3 Plan the Build
Now we turn your roadmap into executable plans.
GSD breaks each phase into small atomic tasks - 2-3 tasks per plan. Each task is designed to fit in about 50% of a fresh context window.
This "aggressive atomicity" is what prevents context rot. No single task is big enough to degrade quality.
STOP: Ready to plan Phase 1?
USER: Yes
Optional: Discuss Before Planning
Quick note: there's an optional /gsd:discuss-phase 1 you can run before planning.
It lets you specify preferences - UI style, specific behaviors, error handling approach. GSD captures those and feeds them into planning.
We'll skip it for now. You can explore it on your own projects.
STOP: Sound good?
USER: Yes
What Happens During Planning
When you run /gsd:plan-phase 1, here's what happens:
- Research - GSD spawns agents to research phase-specific details
- Plan - Creates atomic plans (2-3 tasks each)
- Verify - Runs a verification check to make sure plans actually achieve the phase goals
The planner creates plans, a checker reviews them, planner revises if needed. This loop runs until plans pass verification.
Time expectation: This takes 5-10 minutes. Research, planning, and verification all happen automatically.
When it finishes, you'll see "PHASE 1 PLANNED" and be back at the normal prompt.
STOP: What will you type when you're back at the normal prompt?
USER: Done
Right - you'll type "done" so we can look at the plans together.
Run It
Type /gsd:plan-phase 1 and hit enter.
You'll see agents spawn - planner, checker, maybe a researcher. Let GSD work. This takes 5-10 minutes.
STOP: Run /gsd:plan-phase 1 now. Type "done" when it finishes.
USER: Done
Let's See What GSD Created
ACTION: Find the phase folder and list its contents. Usually something like .planning/phases/01-*/
You should see several PLAN.md files.
ACTION: Read one of the PLAN.md files and show it to the student
Understanding the Plan Structure
Notice the XML structure? This IS the prompt that subagents will execute.
Each <task> has:
- name - what we're doing
- files - what files to touch
- action - specific instructions
- verify - how to check it worked
- done - what "complete" looks like
This isn't a document that becomes a prompt. It IS the executable instruction.
STOP: See how specific each task is? No ambiguity.
USER: Yes
Understanding Waves
Look at the plan numbers: 01-01, 01-02...
The first number is the phase. The second is the plan number.
Plans are assigned to "waves." Independent tasks run in parallel. Wave 1 might have plan 01-01 running. Wave 2 waits for Wave 1 to complete, then runs.
This is "wave-based parallelism." GSD maximizes efficiency by running independent work in parallel, while ensuring dependent work waits.
STOP: Make sense how waves work?
USER: Yes
Why This Matters
Here's what's powerful:
Each plan is small enough for one focused subagent. Each subagent gets a fresh 200k context - no degradation. The last task executes with the same quality as the first.
Your main session stays clean while agents do the heavy lifting.
STOP: Ready to execute and watch subagents build your app?
USER: Yes
What's Next
You have atomic plans ready to execute.
Each plan fits in ~50% context. They've been verified to achieve phase goals. Waves let independent work happen in parallel.
Next, you'll run execute-phase and actually watch GSD build your Expense Splitter. This is where it gets real.
STOP: Ready to build? Type /start-3-4 to continue.
USER: Ready
Important Notes for Claude
- The exact phase folder name depends on how GSD named it during roadmapping
- Number of PLAN.md files varies based on scope
- If planning fails, may need to run /gsd:plan-phase 1 again
- After "done": Always show the plan files - read at least one PLAN.md so student sees the XML structure
- Make sure student understands plans ARE the prompts, not documents that become prompts
Success Criteria
- Student ran /gsd:plan-phase 1 successfully
- PLAN.md files exist in the phase folder
- Student saw the XML task structure (Claude read and showed a plan file)
- Student understands wave-based parallelism
- Student understands why small plans prevent context rot
- Student understands plans ARE the executable prompts